

Ventilation Ancillary Services
Security policy
Delivery policy
Return policy
Ventilation systems can be part of rapid system performance (FCR/FCR-D/FCR-N) through the influence of airflow. The electricity grid's need for increased/reduced load results in short-term effects on operations, typically for 10-30 sec. after which the plants return to normal operation. Demand-controlled ventilation ensures that the influence in the ventilation is subsequently exploited by returning to the starting point |
|
Integration into ancillary services entails that several requirements need to be met: ü Bi-meters must be installed on the consumption, so it is possible to document changes in the operation ü The local control system must be upgraded to make it possible to oversteer the operations and raise/lower ventilation for a short period ü Ventilation system must be operated using AC drives Includes: Router: 1 Simcard: 1 Laptop: 1 CET: 1 CT: 3 |
You might also like